Building
core breakroom and elevator lobby facility renovations to
12 floors of the 13-story Duke Energy Corporation Charlotte
Energy Center. The work included select interior demolition,
millwork, storefront w/glazing film, drywall assemblies,
acoustical and specialty ceilings, cork flooring, painting,
fire protection, plumbing, and electrical items. All floors
will remain fully operational during construction. Work
in the lobbies was performed after 7 p.m. throughout the
construction phase.